(C) 2001, Powered by VISCOMP


Mobile gravel processing



Throughput:
  • 150 to 250 t/h

Water consumption:
  • 250 m3/h (without flushing water recovery)
  • about 50 m3/h (with flushing water recovery)

Equipment flowsheet:
  • mobile charging hopper 10 m3 with tipping grate
  • discharging belt
  • circular vibratory screen (screen surface 6x2 m)
  • centrifugal hydroseparator, diameter 5 m
  • hydrocyclone, type AT 610
  • tracklaying truck, type B6, 22 kW, 0-5.0 m/min
  • Diesel generator
  • electric installation and control station in container